Details

LOCATION

Melbourne, Victoria

STATUS

Completed

type of Project

Pump Replacement

SECTOR

Commercial

CLIENT

Yarra Edge Tower

COMPLETION DATE

2024

Project Overview

BKB HVAC successfully completed a mechanical services upgrade at Yarra Edge Tower, a prominent commercial high-rise in the heart of Melbourne. Finalised in 2024, the project involved the replacement of two existing pumps with high-performance BKB Davey ISO 200-150-400 55kW long coupled pumps, engineered for reliable operation in demanding commercial HVAC systems.

This pump replacement was part of a broader effort to improve the building’s energy efficiency, system reliability, and long-term mechanical performance. The new ISO 200-150-400 pumps offer superior hydraulic performance and are designed to handle high flow rates and pressure requirements typical of large-scale commercial towers.

BKB HVAC managed the complete project lifecycle, from pump selection and equipment supply to installation support and commissioning. Our experienced team worked closely with the facility’s maintenance and engineering teams to ensure a smooth transition and minimal disruption to operations.

By upgrading to BKB Davey long coupled pumps, the Yarra Edge Tower benefits from reduced maintenance, increased efficiency, and improved system performance—essential for ensuring occupant comfort and operational continuity in commercial buildings.

This project highlights BKB HVAC’s ability to deliver tailored HVAC solutions backed by trusted products and technical expertise. With a strong focus on system optimisation and product longevity, BKB Group continues to support Australia’s commercial sector with high-quality mechanical services and equipment.

Gallery

projects-gallery-image-bkb-hvac-yarra-edge-tower-3projects-gallery-image-bkb-hvac-yarra-edge-tower-1projects-gallery-image-bkb-hvac-yarra-edge-tower-2