Details
Project Overview
BKB Group Australia is proud to have successfully completed another major infrastructure project in Terang, Victoria, supporting the Terang BESS (Battery Energy Storage System) with high-performance fire protection and water storage solutions.
As Australia’s energy sector continues to expand, reliable fire infrastructure plays a critical role in supporting the safety, compliance, and operational performance of large-scale energy projects. BKB Group delivered a fully integrated solution designed to meet strict acoustic and performance requirements for this important battery energy storage facility.
The project included the supply and installation of:
- Single Diesel Attenuated Enclosure (90dBA @ 1m) engineered for effective noise reduction and reliable performance
- Two 231kL Powder-Coated Round Tanks designed for durability, corrosion resistance, and long-term performance
- Precision in-house manufacturing and installation by the experienced BKB Group team
Designed specifically for demanding energy infrastructure environments, the system delivers dependable fire protection while meeting critical acoustic requirements. Every component was engineered and manufactured to ensure compliance, reliability, and long-term operational efficiency.
Projects like the Terang BESS development highlight BKB Group’s capability to deliver trusted engineering solutions for complex infrastructure, energy, and industrial projects across Australia.





