Details

LOCATION

Queensland

STATUS

Completed

type of Project

Hydrant Pumps & Tanks

SECTOR

Industrial

CLIENT

Bunnings DC

COMPLETION DATE

2025

Project Overview

The Bunnings Distribution Centre project showcases the expertise of the BKB Tank & Fire division, delivering a fully integrated hydrant pump and water storage solution for a major industrial facility in Flagstone, Qld. This installation featured double diesel hydrant pumps housed within a purpose-built enclosure, paired with dual 18.5KL rectangular fire water tanks, powder-coated in the premium Monument finish for enhanced durability and aesthetic consistency across the site.

Built to meet strict industrial and fire protection standards, the system ensures reliable hydrant performance, long-term tank stability, and seamless integration into the facility’s broader fire safety infrastructure. Completed in November 2025, this project reflects BKB Group Australia’s commitment to delivering high-quality, compliant, and site-specific fire protection and water storage solutions for industrial operations.

Gallery

project-gallery-bkb-group-bunnings-dc-1project-gallery-bkb-group-bunnings-dc-3project-gallery-bkb-group-bunnings-dc-2